Electrical & Fluid Control
Pipes, Tubes & Fittings
Pipe is bought against a standard, and the standard is the part buyers most often omit. "4-inch steel pipe" can mean ASTM A106 seamless, A53 welded, API 5L line pipe, or a Chinese GB equivalent, in schedules 10 through XXS, with different chemistry, different test certificates and a property range that reflects all of it. The name of the item is the same.
For anything in a pressure system, the documentation matters as much as the steel: the mill test certificate, the heat number, the impact test results if the service is low-temperature, and whether a third-party inspection certificate is required at the mill. We confirm what will be issued before the order, because certificates cannot be created afterwards.
Cangnan and Wenzhou dominate stainless fittings, with large carbon-steel pipe mills in Jiangsu and Shandong and flange production concentrated around Wenzhou and Shanxi. The cluster does not guarantee the grade — a mill that can roll A106 can also roll something that only meets it on paper.
Category at a glance
Pipes & Fittings
- Product types mapped
- 6
- Dedicated sub-pages
- 3
- Reply commitment
- 1 business day
- Related sourcing services
- Product SourcingSupplier ComparisonOrder Management
We supply to your specification. We do not manufacture this category and we do not inspect goods — how quality risk is handled is set out separately.
- 15 product familiesone purchase order
- Exported from NingboEXW / FOB / CIF / DDP
- One specification sheetquoted line by line
- Reply in 1 business dayfrom a named person
Coverage
What this family covers
Everything below is supplied, whether or not it has its own page. Linked items have a dedicated page with their own specification detail.
Not listed? The category boundary is a sourcing convenience, not a limit. Describe the item and we will tell you whether it fits.
Specification
What to write down before you ask for an offer
These are the fields that move a pipes & fittings quotation. You do not need all of them to start an inquiry — but each one you leave out comes back as an assumption, and the assumption will be the factory's, not yours.
Send these details- 01
Material standard
ASTM, EN, DIN, JIS or GB grade, stated by number rather than by description.
- 02
Size and wall thickness
Nominal size plus schedule, or OD × wall thickness in mm. Both are needed for tube.
- 03
Manufacturing method
Seamless, ERW, EFW or spiral welded. This changes pressure rating, availability and lead time.
- 04
Ends
Plain, bevelled, threaded (BSP/NPT) or socketed, and whether caps are required.
- 05
Pressure and temperature rating
Design pressure and operating temperature, which together set the allowable stress.
- 06
Test certificates
Mill test certificate to EN 10204 3.1, hydrostatic test, impact test, or third-party witness.
- 07
Surface and coating
Pickled, bright annealed, galvanised, epoxy-coated, or bare with protection.
- 08
Length and tolerance
Random or fixed length, and the length tolerance the installation allows.
Where it goes wrong
What actually causes problems in this category
Specific to pipes & fittings, not generic advice. Each of these is something we ask about before a factory is approached.
The standard, not the size, is the specification
Two pipes of identical OD and wall thickness can differ in carbon content, yield strength and weld quality depending on the standard they were made to. On a low-pressure utility line the difference may never matter; on a process line it decides the pressure rating. We quote by standard and grade, and we do not accept "equivalent" as a substitute unless the specific deviations are listed.
Certificates cannot be manufactured after the fact
A mill test certificate is issued against a specific heat number at the time of rolling. If your project requires EN 10204 3.1, impact testing or a third-party witness, that has to be arranged before production. We list the documentation requirement on the inquiry; a factory that agrees to it afterwards is a factory to be suspicious of.
Fittings must match the pipe, not just the size
A 4-inch elbow from one standard mated to pipe from another can leave a mismatch in wall thickness at the weld root, which is where failures start. We ask for the pipe specification when quoting fittings, so that the schedule and material match at the joint rather than only at the nominal size.
Freight is a design constraint on pipe
Six-metre lengths do not fit a 40-foot container through the door, and 12-metre lengths need flat racks or breakbulk. Cutting to length adds a weld in the field; shipping full lengths adds handling and freight volume. That trade-off belongs in the quotation discussion, not in a surprise at loading.
Common questions
Pipes & Fittings — asked often
Answers include what we cannot do, where that is the honest answer.
Can you supply pipe with EN 10204 3.1 certificates?
Yes, where the mill issues them, and this must be stated before the order. We confirm the certificate type the mill will provide, and we tell you if a request can only be met as 2.2 or as a 3.1 from a third-party inspection body, which takes longer and is arranged separately. What we will not do is accept an order for 3.1 and later supply a certificate that does not match the heat numbers on the pipe.
Do you arrange third-party inspection of pipe and fittings?
No. We are not an inspection provider. We can coordinate a third-party inspector that you appoint, and we will pass on the mill's own test reports, but the contract and its findings are between you and the inspector. We say this plainly because "we will check it for you" is a promise many sourcing agents make and cannot keep.
What is the difference between seamless and welded pipe?
Seamless is pierced from a solid billet and has no weld seam, so it carries higher pressure ratings and is preferred for high-temperature or critical service. ERW and EFW pipe have a longitudinal seam and are more readily available in large diameters. Both can be perfectly adequate; the standard and the service conditions decide which.
Can pipe be cut to length before shipment?
Yes, and it is often worth it: cutting at the mill is more accurate than cutting on site and reduces freight volume. The trade-off is that the cut ends need to be bevelled or capped correctly, and any remaining offcuts are paid for and shipped. We quote both full-length and cut-to-length options where the quantity makes the comparison meaningful.
Related
How this category is usually bought
Services that apply to pipes & fittings, and the industries where it is a recurring purchase.
Industries
Industrial Product Sourcing
Find industrial products against a written specification, with comparable supplier quotations and clearly stated requirements.
Learn moreSupplier Comparison & Offer Analysis
Compare supplier offers on the same specification, quantity and delivery basis, with differences and exclusions made clear.
Learn moreOrder Management & Coordination
Track agreed order milestones, coordinate supplier updates and prepare purchasing information for shipment.
Learn morePipes & Fittings from China, priced and shipped
Send the specification, a drawing, or a photograph of the part you are replacing. A named person replies within one business day — with what we can confirm and what we still need from you.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.