Skip to content

Process

From your purchasing list to a loaded container

Seven steps, each with a stated time expectation, what we need from you, and what we actually do. No stage that only appears after you have paid.

First reply within 1 business day

Quotations being prepared and compared at the Zhaochi office
Quotation preparation — where supplier offers are normalised onto one sheet.
01

Submit your requirements

Takes you 3–10 minutes

You send a product name, a part number, a drawing, a photo of a worn component, or a full purchasing list. Anything precise is useful; anything vague still starts a conversation.

What we need from you

Product description, quantity, destination country. Drawings or samples if the item is custom.

What we do

We record the enquiry for our sales team to review, then confirm the requirement and any missing details.

02

Product & supplier research

1–3 business days

We identify the industrial cluster that produces this category — Yongkang for hardware, Wenzhou for pumps and valves, Taizhou for moulds — and shortlist manufacturers whose core business is the item, not trading companies that list everything.

What we need from you

Nothing further unless the specification is ambiguous. If it is, we ask specific questions rather than generic ones.

What we do

We check whether each candidate actually makes the product, at what scale, and whether they can meet your specification.

03

Compare sourcing options

2–5 business days

Suppliers quote against one specification sheet, not against their own template. Deviations, exclusions and assumptions are listed line by line, so a lower figure cannot hide a thinner material or a looser tolerance.

What we need from you

Confirmation of which deviations are acceptable to you.

What we do

We normalise material grade, tolerance, surface treatment, packing and lead-time basis before comparing offers.

04

One quotation for the whole list

Issued with the comparison

A written quotation covering every line of the enquiry, stating what is included, what is not, which figures are firm, which depend on your confirmation, and how long the offer holds. Trade term, lead time and exclusions are shown per line rather than blended into one figure.

What we need from you

Your decision on supplier and any open technical points.

What we do

We state the trade term (EXW, FOB, CIF or DDP), payment terms and validity period explicitly. Nothing is left to a verbal understanding.

05

We buy the order on our own account

Through the production period

Your order is placed with us, not with fifteen factories. One purchase order reference covers every factory in the project, production is tracked against one loading date, and slippage is reported when it happens rather than discovered at the port.

What we need from you

Deposit payment per the agreed terms, and confirmation of packing and marking requirements.

What we do

We hold the schedule across factories and answer for the whole order as its seller — including the lines we buy from someone else.

06

Consolidation & preparation

3–7 days at origin

Where goods come from several suppliers, they are received at our facility in Yiwu, checked against the packing list, repacked as needed and loaded as one consignment.

What we need from you

Your packing and labelling instructions, and the final destination details.

What we do

We check quantity and identification against the packing list. We do not perform quality inspection — that is stated plainly below.

07

Export and international shipping

Depends on mode and destination

Export declaration and the document set are handled on our side for orders quoted EXW, FOB, CIF or DDP. Sea, air, courier or consolidated, booked with your forwarder or one of ours.

What we need from you

Consignee details and any import requirements in your country.

What we do

We issue the commercial invoice and packing list, coordinate booking, and give you the shipment reference and the loading photographs so you can follow it.

Boundaries

What we do not do

Stated here rather than discovered later. A supplier that is clear about its limits is easier to rely on than one that agrees to everything.

We do not manufacture

We are a supplier and exporter, not a factory. Production photographs on this site are taken at partner manufacturing facilities and are labelled as such — the distinction matters, because a supplier who claims to own every process usually owns none of them.

We do not perform pre-shipment inspection

We are not an inspection body and we will not describe ourselves as one. If third-party inspection is part of your quality process, we coordinate with the agency you appoint — scheduling, facility access, document handover — but the decision and its result remain yours.

We do not substitute a component without written approval

If the bearing brand, motor or material you specified is unavailable, the substitution is put to you in writing with the alternative and its consequence before production. Silently upgrading or downgrading a component is the most common way a delivered order ends up different from the sample that was approved.

Payment terms, in writing

In-stock items
T/T 100% in advance
Customised (OEM/ODM)
T/T 50% deposit, 50% balance before shipment

Payment terms are stated in every quotation. No verbal variations.

Questions

Practical questions about the process

How long does the whole process take from enquiry to delivery?

It depends almost entirely on the product and the shipping mode. A standard component already in production can ship within two to three weeks of order. A custom part requiring tooling typically needs four to eight weeks before it is ready to ship, plus transit. Sea freight adds roughly three to six weeks depending on destination; air freight a few days. We give you a realistic date range in the quotation rather than an optimistic one.

What if I only have a photograph of a broken part?

That is a common starting point, especially for maintenance buyers. Send the photograph with any visible markings and basic dimensions you can measure. We will try to identify the part or its equivalent, and tell you honestly if identification is not possible from what we have.

Do I have to pay anything before receiving a quotation?

No. Research, supplier shortlisting and quotation are free. Payment only begins when you place an order, and the terms are stated in the quotation before you commit.

Can I use my own freight forwarder?

Yes, and many buyers do. We can deliver to your forwarder's nominated warehouse or hand the goods over at a named port. We can also arrange shipping if you prefer one less party to manage.

What happens if the goods arrive wrong?

We check quantity and identification against the packing list before shipment, and we will pursue a supplier when a documented discrepancy is their responsibility. What we cannot do is certify quality before shipment — which is exactly why we say so openly, and why we will coordinate with any inspection agency you appoint.

Start with your list

Send what you have. Henry Han reads every enquiry and replies within one business day.

We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.