Logistics
International Shipping from China
Ocean, air and courier options coordinated from your suppliers to your door — including the part most buyers underestimate: what happens to the goods between the factory and the vessel.
Most shipping problems are not caused by the sea voyage. They are caused by the two weeks before it: goods sitting at a factory that loaded a day late, a booking that did not match the cargo dimensions, a document that named a different quantity. The voyage is predictable. The origin side is where the variability lives.
This page explains the three modes, where the goods physically go between the factory and the vessel, and what information is needed before a shipping option can be quoted at all. It is written for buyers who are comparing incoterms and want to understand what they are actually taking responsibility for.
Trade terms
EXW / FOB / CIF / DDP
Every quotation names the term and the point at which risk transfers.
This page covers
- How the three shipping modes differ in handling, transit time and what they suit
- Where goods physically go between supplier and vessel, and who is responsible at each step
- What information is needed before a shipping option can be quoted
- Typical delays and their causes, stated plainly rather than promised away
- How a shipping quotation is built, and which parts of it are estimates
What decides the shipment
Three things that decide what actually happens
Handling, ownership and timing explain most of the gap between what a buyer expects and what actually arrives.
The freight quote is only as good as the cargo data
Weight, volume, number of packages, and whether the goods can be stacked. A quote built on estimated dimensions is a placeholder, and the difference appears as a re-measurement charge at the warehouse. We ask for carton dimensions and weights before a rate is requested.
Incoterms move responsibility, not work
Changing from FOB to CIF moves who pays the main carriage, not who does the loading, the export formalities or the risk transfer at a particular point. Buyers regularly assume a CIF offer is a delivered offer; it is not, and the difference is usually local charges and inland transport at destination.
Local charges at destination are the surprise line
Terminal handling, documentation fees, customs brokerage, delivery order fees and demurrage are billed at destination, not at origin, and they are often larger than the freight on small shipments. A comparison of freight rates that ignores them is not a comparison of delivered terms.
Process
From factory door to arrival
Each step has an owner. Where the owner is you or your forwarder, that is stated — we coordinate, we do not take over responsibilities that legally sit elsewhere.
- 01
Booking and space
Space is reserved against the cargo data and the required sailing date. On busy routes the booking is the constraint, not the vessel, and a late booking is a later sailing.
- 02
Collection or delivery to origin
Goods move from the factory to a warehouse or directly to the port, depending on the mode and the consolidation plan. This is where a factory that is two days late becomes a missed vessel.
- 03
Export formalities
Export declaration is handled by the licensed party you designate — your forwarder or ours. We coordinate the handover of goods and documents; we do not act as the exporter of record.
- 04
Main carriage and arrival
The carrier moves the goods; arrival triggers destination charges, customs clearance in your country, and inland delivery. Each of those is a separate item with a separate party responsible.
Fit
When this mode suits — and when it does not
The second column is the useful one. A supplier who says a mode is wrong for your cargo has saved you money.
Suits
- Buyers shipping from more than one supplier
- First-time importers who need the process explained in order
- Companies comparing incoterms before committing
Does not suit
- Single small parcels that a courier handles end-to-end
- Buyers who already have a forwarder and only need the goods released
Common questions
International Shipping — asked often
Which incoterm should we use?
EXW, FOB, CIF and DDP are all available, and the right choice depends on whether you have a forwarder you trust and whether you want to control the main carriage. FOB is the most common for buyers with their own logistics; DDP is simpler but hides the components inside one number, which makes it hard to see what you are paying for.
What do you need to quote shipping?
Carton or package dimensions and weights, total volume, the pickup location, the destination address or port, and the date the goods will be ready. Without the cargo dimensions any rate is an estimate, and we will label it as one rather than presenting it as firm.
Do you handle customs clearance in our country?
No. Clearance at destination is handled by a broker in your country, appointed by you or by your forwarder. We provide the commercial documents and packing data that clearance depends on, and we check them against the order before shipment — but the clearance itself is not ours.
Other modes
Compare with the alternatives
Send the cargo data and we will quote the route
Package dimensions, weights, pickup location, destination and the ready date. With those five things a shipping quotation is firm rather than an estimate.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.