Machinery & Industrial Equipment
Machinery is the hardest category to compare and the easiest to buy wrong. Two offers for a "fully automatic filling machine" can differ in frame gauge, servo brand, whether the guarding is interlocked, whether the HMI runs in your operators' language, and whether a spare nozzle is a stock item or a six-week order. The name on the quotation is identical. The machines are not.
So we start from the job rather than the category. Throughput at the product size you actually run, the power supply on your site, who will maintain the machine, and what happens when it stops — those four answers eliminate most of the wrong factories before any offer is discussed at all.
China builds industrial machinery in regional clusters that specialise. Plastics and moulding equipment concentrates around Ningbo and Taizhou, packaging lines around Wenzhou, electronics-heavy automation and small CNC around Guangdong. Sourcing outside the right cluster is the most common reason a machine that looked right becomes the wrong machine: the factory can build it, but they do not build it every week.
Category at a glance
Machinery & Equipment
- Product types mapped
- 7
- Dedicated sub-pages
- 0
- Reply commitment
- 1 business day
- Related sourcing services
- Product SourcingSupplier ComparisonCustom Manufacturing
We supply to your specification. We do not manufacture this category and we do not inspect goods — how quality risk is handled is set out separately.
- 15 product familiesone purchase order
- Exported from NingboEXW / FOB / CIF / DDP
- One specification sheetquoted line by line
- Reply in 1 business dayfrom a named person
Coverage
What this family covers
Everything below is supplied, whether or not it has its own page. Linked items have a dedicated page with their own specification detail.
Not listed? The category boundary is a sourcing convenience, not a limit. Describe the item and we will tell you whether it fits.
Specification
What to write down before you ask for an offer
These are the fields that move a machinery & equipment quotation. You do not need all of them to start an inquiry — but each one you leave out comes back as an assumption, and the assumption will be the factory's, not yours.
Send these details- 01
Process and throughput
Units per hour at your product size, not the maximum the brochure quotes at ideal conditions.
- 02
Product dimensions and material
Film thickness, granule size, wall thickness, fill weight. A machine built for a different input is a different machine.
- 03
Power supply on site
Voltage, phase and frequency. 380V/50Hz is standard in China and often wrong for the destination country.
- 04
Control platform and language
PLC and HMI brand, whether the interface can be delivered in your operators' language, and whether the program is locked.
- 05
Guarding and compliance
Which safety devices are fitted, and which declaration the factory can actually issue for your market.
- 06
Wear parts and spares
The parts that fail in normal service, their lead time, and whether they are standard or factory-specific.
- 07
Installation requirements
Foundation, lifting points, compressed air and water supply, and who commissions the machine at destination.
- 08
Packing and container fit
Overall dimensions after disassembly, and whether the shipment needs a flat rack or open top instead of a standard container.
Where it goes wrong
What actually causes problems in this category
Specific to machinery & equipment, not generic advice. Each of these is something we ask about before a factory is approached.
A machine name is not a specification
Catalogues reuse the same model name across a range that can differ by a factor of three in capacity. When we request quotations, we send the same written requirement sheet to every factory and ask them to quote against it line by line, so that a difference between offers points to a real difference in the product rather than a difference in what each factory assumed.
Oversized equipment is a logistics problem before it is an installation problem
Many industrial machines do not fit a 40HQ without disassembly, and some need a flat rack or open top with breakbulk handling at both ends. That problem appears late, after the machine is built, and it is never in the machine quotation. We check dimensions and lifting points before the order, not after.
Ask what breaks, not what it can do
A factory that can name its wear parts, their replacement interval and their availability is a factory that has machines in service. One that answers "nothing breaks" has not been asked before. The wear-parts list belongs in the quotation, because it is what the second and third year of ownership actually looks like.
Documentation is part of the product
A manual in a language nobody on site reads, a wiring diagram that does not match the panel, or a missing spare-parts list turns a working machine into a stopped one. We ask for the manual, the electrical schematic and the parts list as deliverables, in the same way we ask for the machine.
Common questions
Machinery & Equipment — asked often
Answers include what we cannot do, where that is the honest answer.
Can you supply machinery for our voltage and frequency?
Yes, and it has to be stated before the order rather than after. A 60Hz motor running on 50Hz turns slower and loses torque; heaters, transformers and VFDs are configured per market. We put the supply specification on the requirement sheet so every factory quotes the same electrical build, and we flag where a factory is substituting a different motor brand to meet it.
Do you provide CE certification or a conformity assessment?
No. We are not a notified body, and we do not perform third-party inspection. What we do is ask the factory for the declaration of conformity and technical file they hold, tell you exactly what they can and cannot provide before you commit, and record that in writing. If your market requires a notified-body certificate, that is a separate service you should buy from an accredited body.
What happens if the machine arrives damaged?
We agree the packing specification before production, including how the machine is braced inside the container, and we require loading photographs from the factory. Marine insurance is arranged with the shipment. If damage occurs, we coordinate the claim with the forwarder and the insurer — we do not carry out a damage survey ourselves.
Can you supply spare parts after the machine is delivered?
Yes, and it is easier if the parts list is captured at order stage. We record the wear-parts list, the motor and control brands, and the factory contact, so that a part can be re-ordered by number later instead of by photograph and description. Factory-specific parts do become harder to obtain if the model is discontinued, which is worth knowing before choosing a non-standard design.
How long does a machinery order take?
Production is rarely the critical path. Drawing confirmation, power-supply details, sample approval and packing agreement usually decide the date. We give you a timeline built from those steps rather than a production figure alone, and we tell you which items are still waiting on your confirmation.
Related
How this category is usually bought
Services that apply to machinery & equipment, and the industries where it is a recurring purchase.
Industries
Industrial Product Sourcing
Find industrial products against a written specification, with comparable supplier quotations and clearly stated requirements.
Learn moreSupplier Comparison & Offer Analysis
Compare supplier offers on the same specification, quantity and delivery basis, with differences and exclusions made clear.
Learn moreCustom Manufacturing Sourcing
Source parts to your drawings, materials and quantities, with manufacturing requirements and sample approval agreed before production.
Learn moreMachinery & Equipment from China, priced and shipped
Send the specification, a drawing, or a photograph of the part you are replacing. A named person replies within one business day — with what we can confirm and what we still need from you.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.