Site, Safety & Custom
Custom Industrial Parts & OEM Products
Custom parts are bought on a drawing, and the drawing is the product. A drawing that leaves a tolerance unspecified does not mean "anything is acceptable" — it means the factory will apply a general tolerance from its own standard, which may be ISO 2768-m or something looser. The part will be made to the drawing and rejected on arrival, and the argument will be about a number nobody wrote down.
The second constraint is manufacturing method. The same part can be machined, cast, stamped, forged or printed, and each route has a different tooling requirement, minimum quantity and tolerance capability. A buyer who asks for "CNC" on a part that should be die-cast pays several times over for the part; one who asks for casting on a part needed in fifties pays for tooling that never amortises.
Zhejiang and Guangdong carry most of China's machining and moulding capacity, with Ningbo and Taizhou strong on moulds and die casting, and Shenzhen and Dongguan on precision machining and rapid prototypes. Because the clusters are dense, the first-quote spread is wide, and the useful comparison is capability against the drawing.
Category at a glance
Custom Parts & OEM
- Product types mapped
- 6
- Dedicated sub-pages
- 1
- Reply commitment
- 1 business day
- Related sourcing services
- Supplier SourcingCustom ManufacturingOEM / ODM
We supply to your specification. We do not manufacture this category and we do not inspect goods — how quality risk is handled is set out separately.
- 15 product familiesone purchase order
- Exported from NingboEXW / FOB / CIF / DDP
- One specification sheetquoted line by line
- Reply in 1 business dayfrom a named person
Coverage
What this family covers
Everything below is supplied, whether or not it has its own page. Linked items have a dedicated page with their own specification detail.
Not listed? The category boundary is a sourcing convenience, not a limit. Describe the item and we will tell you whether it fits.
Specification
What to write down before you ask for an offer
These are the fields that move a custom parts & oem quotation. You do not need all of them to start an inquiry — but each one you leave out comes back as an assumption, and the assumption will be the factory's, not yours.
Send these details- 01
Drawing and revision
A dimensioned drawing with tolerances, a revision letter, and the CAD file in a neutral format.
- 02
Material and condition
Grade, heat treatment, surface treatment, and whether a material certificate is required.
- 03
Critical dimensions
Which features are functional and which are cosmetic, since inspection effort should follow that split.
- 04
Tolerance and finish
General tolerance standard, specific tolerances, and surface roughness (Ra) where it matters.
- 05
Process
Machining, casting, stamping, forging or moulding, and whether the process is fixed or open to proposal.
- 06
Quantity and tooling
Order quantity, annual volume, and the tooling and its ownership.
- 07
First article
Whether a first-article sample and dimensional report are required before mass production.
- 08
Marking and packing
Part marking, traceability, and protection for the surface finish in transit.
Where it goes wrong
What actually causes problems in this category
Specific to custom parts & oem, not generic advice. Each of these is something we ask about before a factory is approached.
General tolerances are not a default you can rely on
ISO 2768-m is common and ISO 2768-c is looser and easier to hold. A drawing that does not state which one applies will be made to whichever the factory uses, and the difference is visible on any dimension over 100mm. We ask for the standard to be stated on the drawing before RFQ, because a tolerance conversation after delivery has no good outcome.
The process decides more than the factory does
Quantity and geometry determine which process is viable: machining for tens, die casting or stamping for thousands with tooling, moulding for plastics with a tooling investment. Comparing offers from factories using different processes is not a comparison at all. We ask the factory to state the process in their offer, and where a different route exists we raise it before the order.
Tooling ownership is worth a sentence in the contract
Moulds and dies are paid for by the buyer and often held by the factory. If the relationship ends, the tooling may not be usable elsewhere without modification, and retrieving it can be harder than expected. We record who holds the tooling, its condition and the terms on which it can be transferred, at the point of the first order.
A first article settles more than a recall ever will
For any new part, a first-article sample with a dimensional report catches the interpretation errors before a production run. It adds days at the start and saves weeks later. Where the part is safety-related or the tooling is substantial, the first article should be a condition of the order rather than a favour. We can coordinate the sample; we do not perform the dimensional inspection ourselves.
Common questions
Custom Parts & OEM — asked often
Answers include what we cannot do, where that is the honest answer.
What files do you need to quote a custom part?
A dimensioned drawing with tolerances and a revision, the material and surface treatment, the quantity, and — where it exists — the 3D model. A STEP file alone is not enough to quote, because it carries nominal geometry without tolerances. If you only have a sample part, we can ask a factory to reverse-engineer a drawing, but you should approve that drawing before production.
Do you provide first-article inspection reports?
The factory can provide a dimensional report on the first article, and we will pass it on. It is the manufacturer's own measurement, not an independent verification. If your process requires a formal FAI to AS9102 or PPAP, that has to be specified at inquiry, because it changes the lead time and which factory can do it. We do not perform inspection ourselves.
How is tooling handled?
Tooling is usually a one-off item, quoted separately from the part, and it is normally settled with the first order. It is not always refundable and not always transferable. We show it as a separate line so you can see the quantity at which it overtakes a machined alternative, and we record the ownership terms before production starts.
What is a realistic lead time for a new custom part?
For machining from drawing, sampling is typically a matter of days to a couple of weeks, with production following. For parts requiring new tooling, the tool is the long pole and typically runs into weeks before the first sample. We give you the sequence with the tooling step called out separately, because a single lead-time number for a tooled part hides the step that actually controls the date.
Related
How this category is usually bought
Services that apply to custom parts & oem, and the industries where it is a recurring purchase.
Supplier Sourcing in China
Identify manufacturers in relevant Chinese industrial clusters and shortlist suppliers against your product requirements.
Learn moreCustom Manufacturing Sourcing
Source parts to your drawings, materials and quantities, with manufacturing requirements and sample approval agreed before production.
Learn moreOEM / ODM Sourcing
Coordinate OEM and ODM sourcing with product specifications, branding, packaging and approval requirements recorded for the order.
Learn moreCustom Parts & OEM from China, priced and shipped
Send the specification, a drawing, or a photograph of the part you are replacing. A named person replies within one business day — with what we can confirm and what we still need from you.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.